You will need to schedule this using Oracle DBMS scheduler.
In order to run the 8 procedures, there are couple of ways, you can create a small procedure that calls the 8 procedures respectively.
After that, you will create a DBMS scheduler job that will execute the procedure which calls the main procedure.
The script below creates the main procedure to call the other procedures
CREATE OR REPLACE PROCEDURE RUN_8PROCEDURES AS
BEGIN
pkg_cd.PRC_CD_CASEDATAENTRY;
pkg_cd.PRC_CD_DEDUP;
pkg_cd.PRC_CD_CIBIL;
pkg_cd.PRC_CD_TVR;
pkg_cd.PRC_CD_SANCTION;
pkg_cd.PRC_CD_DOWNPAY;
pkg_cd.PRC_CD_DOC_CPA;
pkg_cd.PRC_CD_DOC_QA;
pkg_cd.PRC_CD_PDN_REQ;
pkg_cd.PRC_CD_PDN_AUTHORIZE;
END;
/
This script creates a job that runs every minute and runs the main procedure.
BEGIN
DBMS_SCHEDULER.Create_job (
job_name => 'MY_JOB_THAT_RUNS_EVERY_MINUTE',
repeat_interval => 'FREQ=minutely;interval=1',
job_type => 'STORED_PROCEDURE',
job_action => 'RUN_8PROCEDURES',
enabled => TRUE
);
END;
/