I need to perform an incomplete recovery. We keep 7 days of backups, and I want to restore the database as it was 7 days ago. I've not done this before.
My question is: I can use the SET UNTIL TIME for the restore / recovery. But, with regards to restoring the control file and SPFile........do I need to restore those separately with SET UNTIL TIME, or will RMAN be smart enough to restore everything I need based on the timeframe I set?
Thank you.